T01
|
Trial production of samples on manufacturing equipment |
Completed |
|
T02
|
Testing and classification of the new panel
Fire tests by an external institute and obtaining proper classification
Other properties tests by an external institute |
Tests according to BS standards done (see technical datasheet) European testing: on going
On going |
|
T03
|
Equipment upgrade and validation of industrial production process of the new panel
Upgrading/setting up of the production process
Analysis of the potential modification on the production process
Process capacity |
Finalised
Finalised
On going |
|
T04
|
Development and certification
Development of a detailed design of an integrated insulation system
Development of optimised building envelope elements
Certification of the new integrated system |
Finalised
Finalised
On going |
|
T06
|
Testing and validation of the new products in prototype buildings
In situ evaluation of the new reflective technology
In situ evaluation of the new PCM thermal mass panels |
On going
Completed |
|
T07
|
Performance and durability normalisation of reflective products
Screening of emissivity measurement techniques and ageing performance measurements
Creation of new European Norms standard |
On going
On going |
|
T08
|
Dissemination of results |
On going (see DuPont™ Energain® & DuPont™ Climate Systems websites:
- Brochures
- Animations
- Events/Fairs
|
|