DuPont Powder Coatings' Customer Technical Support Department has the ability to provide our customers a complete analysis of their powder coating operation. Our thorough approach results in a report of all findings and suggested courses of action to improve product quality, increase productivity, or reduce operating costs. The subject areas we review include, but are not limited to, the following:

  1. Conveyor line and racking
    a) Condition of the conveyor and oiler
    b) Cleanliness of the hangers
    c) Grounding
    d) Racking density and hanging method
  2. Preparation and pretreatment
    a) Metal preparation
    b) Condition of all stages
    c) Condition of the nozzles, gauges, screens and other associated instruments
    d) Check of pH, TDS, Temp., Spray pressures, etc…
    e) Evaluation of city water
  3. Coating area
    a) Cleanliness of coating area
    b) List of contamination problems
    c) Condition of compressed air
    d) Room temperature and humidity
    e) Air movement in coating area
  4. Coating equipment and operation
    a) Documentation of booth and gun types
    b) Check of booth draw, fluidized pressure, and other gauges
    c) Check of booth condition
    d) Record of all gun settings
    e) Evaluation of guns, included kV output
  5. Ovens
    a) Evaluation of dry off oven
    b) Evaluation of parts exiting the dry off oven
    c) Evaluation and profile of cure oven
  6. Quality Control
    a) Evaluation of incoming quality control
    b) Evaluation of finished good quality control
    c) Perform quality control tests on finished parts
  7. Powder Storage
    a) Evaluation of powder storage area
    b) Record of powder being stored
  8. Audit summary on one page for easy reading

 


We recognize that accurate auditing requires making observations and providing data back to both parties in the customer-vendor relationship. Because it is direct and "to the point", it can often be perceived as harsh criticism. However, we hope that you would use the information to reinforce the many positive aspects of your operation as well as to focus attention toward improvement.

Because this type of audit results in an approximate 30 - 50 page document, extra time must be allowed once the audit is complete. The actual audit process can be completed in one to two days with no interruption of production, depending on the complexity of your powder coating operation. In order to receive a full audit of your facility, please contact your DuPont Powder Coatings salesperson for availability.